Posted on | Posted in Uncategorized


A sewer main backup has been detected in the area of the German and Duke Street four-way stop.  Crews are working to resolve the issue.  Delays at the four-way stop are to be expected.  For further information, please contact Frank Welch, Public Works Director, at 304-702-2895.